Start With the Lot Size Behind the Sample
An inspection report opens with two numbers that shape the rest: lot size and sample size. Six hundred cartons out of 20,000 is three percent of the shipment, but read it as a statement about the batch, not every box.
The sampling plan must be named. AQL plans tie accept and reject numbers to lot size, so a stated level gives a reproducible decision. An unnamed plan is an unfinished report; a sample size alone cannot be tested later.
What Each Defect Class Actually Decides
The classes are not three shades of one problem. Critical defects touch safety, legal labelling or the product itself, and one confirmed finding usually stops the lot. Major defects show at retail distance or break the function: a failed glue seam, a torn tuck, a crease that splits. Minor defects go unnoticed.
- Critical: stop and re-inspect the lot.
- Major: judged on the accept number; sort or rework.
- Minor: tolerance, not a decision alone.
Read the class before the number. A lot can pass on minors while carrying a cluster of majors on one pallet, so ask for raw counts per defect code, not a summary.
Photographs and Measurements Worth Demanding
A finding without a photograph is an opinion. Each non-conforming sample needs a legible close-up plus a wider shot showing where it sits, and colour calls need controlled light beside the approved reference. Measurements beat adjectives: caliper, glue seam width, crease position against the dieline.
What a Pass Covers, and What It Leaves Open
A pass means the sample met the agreed criteria at the moment of inspection. It does not certify unsampled pallets, cover transit damage, or settle a standard never written down. A supplier working to a recognised quality system, such as the ISO 9001 standard published by the International Organization for Standardization, keeps records, reference samples and calibration logs. Our design and engineering support writes each decision into the file that inspection measures against.
Escalating a Result You Disagree With
Escalate in steps, not in complaint. Ask for raw data: counts per code, the sampling plan, full-resolution photographs. Then re-inspect jointly on a fresh sample from the disputed pallets. Agree the outcome before rework starts: sort, rework, replace, or a documented deviation. If the dispute repeats, fix it upstream: a tighter specification, a signed reference sample and a standard agreed before the next run. Our production notes walk through those gates, the formats sit under custom folding cartons, and you can send a report to us for a second reading.
Frequently asked questions
Does a passed inspection mean the whole shipment is good?
No. It means the drawn sample met the agreed criteria. Unsampled pallets, transit damage and anything the written specification never covered stay outside the result.
Which AQL level should a carton buyer specify?
It depends on how visible the defect is at retail. Most programmes tighten the level for print and glue and loosen it for minor surface marks, and name the level in the purchase order so the report can be reproduced.
What should I do when the report and my own check disagree?
Request the raw counts, the sampling plan and the original photographs, then re-inspect a joint sample from the disputed pallets with the approved reference on the table. Record the agreed outcome before any rework starts.
