Two suppliers quote the same carton and the figures sit far apart. Three months later the reorder comes back above the first order, with no change to the artwork. Neither surprise is unusual, and neither means a supplier is being difficult; both come from a quotation that blends five cost blocks which behave in completely different ways.
The five blocks inside a folding carton quotation
Board is the largest block and the most volatile. It is quoted by grade, caliper and grammage, and the mill price moves with recovered fibre and energy, so a quote built on one month of board is only as good as its validity clause. Print is the second block: the number of colours, the ink coverage, and whether the job runs sheet-fed offset, flexo on a web or digital.
Finishing covers everything after ink: varnish or aqueous coating, foil, embossing, window patching and the labour to handle each pass. Die-cutting and gluing form the fourth block, including the cutting die, the stripper and the folder-gluer set-up. Outbound freight is the fifth: weight, pallet count, loaded volume and the delivery term. A quotation showing one blended figure conceals all five.
How quantity moves each block at a different rate
Materials scale with quantity but not perfectly. Sheet counts carry a waste allowance for make-ready and running, and that allowance shrinks as the run lengthens, so board cost per carton falls without any change in grade. Print behaves the same way across a fixed set of plates, then flattens once the press is running efficiently.
The fixed items are the ones buyers feel. Plates, a cutting die, a foil die, prepress proofing and press make-ready are paid once and then spread across the run. At a small quantity they dominate the unit figure; at a large quantity they almost vanish. Finishing and gluing stay closer to linear, because every carton still passes through the same operations, yet the set-up time per run still has to be recovered.
Why two quotes for the same carton are not comparable
A lower figure usually carries a lighter board, a single-wall instead of a double-wall construction, one fewer colour, no coating, or a die the supplier already owns. It may leave tooling and freight outside the figure, or quote a delivery term that hands transport to the buyer. None of that is dishonest; it is simply a different scope presented in an identical format.
The way to compare is to strip each offer back to a common basis: same board grade and caliper, same print method and colour count, same finishing list, tooling shown separately, packing quantity per carton and per pallet, and the delivery term stated in full. Published fibre and board reporting explains why the board line has moved, but it cannot repair a quote that was never scoped the same way as its rival.
What makes a reorder price change, and how to hold a quote steady
Four causes explain most reorder movements: board price, a quantity change that shifts the fixed items per unit, tooling charged a second time because the die was not stored, and a freight rate valid only for the first sailing. A fifth cause is quieter: a substitution made in the first run, such as a lighter liner or a different adhesive, kept out of the price but built into the specification.
The remedy sits in the request for quotation. Ask for a breakdown by block rather than one figure, state the validity period and the basis used for board, and confirm that plates and dies are retained for the life of the artwork. Then the second order can be read against the first line by line, and a movement can be attributed instead of argued about.
Where the cost structure of a carton is unclear, send the artwork, the target quantity and the delivery point; a quotation with the five blocks shown separately can be prepared against those inputs. Board options and structures are listed on the folding carton range, and the design and engineering support covers dielines and tooling planning. The blog carries further notes on specification and inspection.
Frequently asked questions
Why is the reorder higher than the first order?
Usually the board line has moved, the quantity is smaller so fixed items spread over fewer cartons, or the die has to be made again because it was never stored.
Should tooling be shown separately in a quote?
Yes. Plates and dies are paid once and belong to the artwork. Shown separately they can be amortised, stored and reused on the next run instead of being buried in the unit figure.
How long should a quotation stay valid?
Long enough to cover the buying decision. Board moves faster than conversion, so many suppliers split validity into a firm period for tooling and conversion and a shorter one for board with a stated basis.
What makes two quotes look so different?
Different board grade, caliper, print method, finishing list, packing quantity and delivery term. Once those are matched line by line, what remains is mostly conversion efficiency and order size.